Skip to main content

Your cookie preferences - Havant Borough Council

Accepting cookies helps us improve this platform. Read our cookie policy.

Havant Borough Council Home
  • Home
  • Events
  • Information Page
  • FAQ
  • Glossary

karen Fry

Member since 28 October 2022

All input submitted by this participant

There are 2 projects available.
Trending ideas have loaded.

Using existing sites

karen Fry•4 years ago As land use is the issue when it comes to keeping land free for drainage or further development, why do we have so many one story buildings in Havant? Why do we have so much unused space from the lovely old Havant shopping area and even the relatively new meridian centre. Havant has sprawled out towards the west with disastrous effects on traffic flow. I think many of these buildings should be converted into small apartments and flats, thus offering affordable housing without using up yet more green field sites. The idea of two story development is a very old one, why not go back to it when it comes to retail as well as housing. What was wrong with small terraced housing? This type of residence reduces external walls for heat conservation, minimizing land use and increasing affordable housing.

full to capacity

karen Fry•4 years ago The increase in new buildings in the Havant borough has been significant and I am shocked to hear that the pace is to get even higher. Despite this the increase in population in the recent survey was only 1%. This surely indicates the number of properties that are being bought as second properties. Also the permanent population is aging and as such many are likely to be in secure housing or homes. Why do we need all the extra housing? We do not need extra housing, we need more affordable housing by changing existing properties into flats or similar.The water treatment is at full capacity already, the harbour water continues to get more polluted as new houses are built. How are we to ensure our area of outstanding natural beauty is maintained? The amount of free soil area to absorb the extra rainfall we can expect is decreasing so how are we to deal with the extra run off? Our roads are already full to capacity, it is almost impossible to turn right on the Havant road in Emsworth. Frequently I will turn left and look to do a U turn in nearby roads to go the correct way. How are we going to deal with any extra traffic on the narrow roads going through the village/town?
  • Terms and conditions
  • Privacy policy
  • Cookie policy
  • Accessibility statement
  • Site Map
Powered byGo Vocal formerly CitizenLab